INDUSTRIAL WATER AND PILOT PLANT SOLUTION
OUR EXPERIENCE
Through years of system development, we have continuously been exposed to new challenges related to the diverse characteristics of water and wastewater, strengthening our capabilities to better serve our partners and customers.
Seawater Desalination
Reverse osmosis (RO) has proven to be the most reliable, cost-effective, and energy-efficient technology for producing fresh water compared to other desalination technologies. In 2017, Enerba successfully commissioned a desalination plant at PT Smelting, Gresik Smelter & Refinery.
Unit capacity 1500 m3/day
Brikish Water Reverses Osmosis
ENERBA-BWRO has proven to be the most reliable, cost-effective, and energy-efficient process for brackish water desalination. In 2017, Enerba successfully delivered a reverse osmosis desalination system for the Ministry of Marine and Fisheries (KKP) on Natuna Island to support clean water supply in the region.
Unit capacity 250 m3/day
Ultra Filtration (UF)
The ultrafiltration system is designed to address clean water challenges using peat water as the source, particularly in the Pekanbaru area, where peat soil conditions limit access to consumable clean water.
Unit capacity 720 m3/day
Our Other Projects:
Sea Water Reverse Osmosis
Year: 2024
Location: Penajam – Kalimantan Timur
User: PT. Mineral Langgeng Megatama
Project: Sea Water Reverse Osmosis (SWRO)
Capacity: 5 m3/hrs
Scope: Engineering, Procurement, and Construction
Brikish Reverse Osmosis (BWRO)
Year: 2020
Location: Tangerang, Banten
User: PT Paragon Technology and Innovation
Project: Reverse Osmosis (RO)
Capacity: 2 m³/hour
Scope: Engineering, Procurement, and Construction
SWRO, BWRO, Mixed Bed Package
Year: 2020
Location: Senoro
User: Pertamina Senoro
Project: SWRO, BWRO, Mixed Bed Package
Capacity: 42 GPM / 10 m³/hour
Scope: Engineering, Procurement, and Construction
Water Treatment Plant (WTP)
Year: 2019
Location: Cikarang, Jawa Barat
User: PT Muliaglass Container Division
Project: Treatment Plant (WTP)
Capacity: 50 m3/jam
Scope: Engineering, Procurement, and Construction
Sea Water Reverse Osmosis
Year:
Location: Belawan – Indonesia
User:
Project: Sea Water Reverse Osmosis
Capacity: 800 m3/day
Scope: Engineering, Procurement, and Construction
Sea Water Reverse Osmosis
Year:
Location: Pekalongan – Indonesia
User:
Project: Sea Water Reverse Osmosis
Capacity: 300 m3/day
Scope: Engineering, Procurement, and Construction
Sea Water Reverse Osmosis
Year:
Location: Lombok – Indonesia
User:
Project: Sea Water Reverse Osmosis
Capacity: 48 m3/day
Scope: Engineering, Procurement, and Construction
Sea Water Reverse Osmosis
Year:
Location: Kendari – Indonesia
User:
Project: Sea Water Reverse Osmosis
Capacity: 500 m3/day
Scope: Engineering, Procurement, and Construction
Brikish Reverse Osmosis (BWRO)
Year:
Location: Jakarta – Indonesia
User: Apartemen Pluit View
Project: Brikish Reverse Osmosis
Capacity: 250 m3/day
Scope: Engineering, Procurement, and Construction
Brikish Reverse Osmosis (BWRO)
Year:
Location: Bogor – Indonesia
User: Pesantrean Az Zikra
Project: Brikish Reverse Osmosis
Capacity: 20 m3/day
Scope: Engineering, Procurement, and Construction
Ultrafiltration
Year:
Location: Pekanbaru – Indonesia
User:
Project: Gambut – Ultrafiltration
Capacity: : 720 m3/day
Scope: Engineering, Procurement, and Construction
Ultrafiltration
Year:
Location: Solo – Indonesia
User: Musium Sangiran
Project: River – Ultrafiltration
Capacity: : 48 m3/day
Scope: Engineering, Procurement, and Construction
Reverse Osmosis (RO)
Year: 2018
Location: South Tangerang, Banten
User: PTSEIK – BPPT
Project: Reverse Osmosis (RO)
Capacity: 50 GPD
Scope: Engineering, Procurement, and Construction
Sea Water Reverse Osmosis
Year: 2018
Location: Pramuka Island, Jakarta
User: Suku Dinas Sumber Daya Air DKI Jakarta
Project: Sea Water Reverse Osmosis
Capacity: 250 m3/day
Scope: Engineering, Procurement, and Construction
Ultrafiltration
Year: 2017
Location: Pluit, Jakarta
User: PT. Ardon Inti Presisi
Project: Ultrafiltration
Capacity: 40 m3/h
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
PT DuPont Indonesia is a manufacturer of pesticide fertilizers that generates wastewater which cannot be treated using biological processes. Advanced Oxidation Processes (AOP) provide an effective, modern, and compact solution for handling pesticide wastewater.
Unit capacity 200 liter/hour
Advanced Oxidation Process (AOP)
AOP system that we build for the needs of users of PT. Pertamina on waste generated water produced, this handling is intended to provide completion on waste water that is ready discharged into the city channel.
Unit capacity 6 m3/hour
Our Other Projects:
Leachate Treatment Plant
Year: 2022-2023
Location: TPST Bantar Gebang (RDF Plant)
User: DLH DKI Jakarta
Project: Wastewater Treatment (Leachate)
Capacity: 300 m3/day
Scope: Engineering, Procurement, and Construction
Leachate Treatment Plant
Location: Tangerang
User: PT. Panarub Industry
Project: Leachate Treatment Plant (Landfill Mining & RDF Plant)
Capacity: 12 m3/day
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year: 2022
Location: TPST Bantar gebang, Bekasi, Jawa Barat
User: UPST Dinas Lingkungan Hidup DKI Jakarta
Project: Waste Water Treatment Plant (WWTP) with AOP
Capacity: 12,5 – 15 m3/jam
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year: 2018
Location: Bakalan
User: PT Karyadibya Mahardhika
Project: Waste Water Treatment Plant (WWTP) with AOP
Capacity: 70 m3/hari
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year: 2018
Location: Pandaan
User: PT. Japan Tobacco International
Project: Waste Water Treatment Plant (WWTP) with AOP
Capacity:135 m3/hari
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location: Balongan – Indonesia
User: PT. Pertamina
Project: Clean water, AOP
Capacity: 8 m3/hour
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location: Jababeka – Indonesia
User: PT. Unilever Indonesia Tbk
Project: Clean water, AOP
Capacity: 8 m3/hour
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location: Pasuruan – Indonesia
User: PT. Dupont Indonesia
Project: Clean water, AOP
Capacity: 500 liters/hour
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location: Balongan – Indonesia
User: PT. Pertamina
Project:Clean water, AOP
Capacity: 200 m3/hour
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location: Jababeka, Cikarang, Indonesia
User: PT. Unilever Indonesia
Project: Clean water, AOP
Capacity: 170 m3/day
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location:
User:
Project:
Capacity:
Scope: Engineering, Procurement, and Construction
Advanced Oxidation Process (AOP)
Year:
Location:
User:
Project:
Capacity:
Scope: Engineering, Procurement, and Construction
Fermentor
The fermentation process deals with the growth factors of organisms; therefore, it requires a complex control and monitoring system. Our fermentation reactor is equipped with an automation system and SCADA to facilitate process control and monitoring
Unit capacity 500 liter/hour and 100 liter/hour
Liquid Salt 20% Production
The liquid salt production process for 20% concentration requires precise control of water quality and salt concentration to ensure stable and consistent output. Due to the sensitivity of the process, a reliable control and monitoring system is essential to maintain operational stability and product quality. Therefore, the liquid salt production unit is equipped with an integrated automation system and SCADA to facilitate real-time process control, monitoring, and optimization.
Unit capacity 500 liter/hour
Our Other Projects:
Fermentor (Pilot Plant)
Year: 2021
Location: Surabaya, Jawa Timur
User:Universitas Airlangga (UNAIR)
Project: Fermentor (Pilot Plant)
Capacity: 10 & 500 liter/hour
Scope: Engineering, Procurement, and Construction
Integrated Membrane System for Liquid Salt Production
Year: 2021
Location: PLTU Suralaya, Cilegon, Banten
User: PT. Phoenik Syams Indonesia (BRIN)
Project: Integrated Membrane System for Liquid Salt Production 20%
Capacity: 500 liter/hour
Scope: Engineering, Procurement, and Construction
Integrated Membrane System for Liquid Salt Production
Year: 2021
Location: Gresik, Jawa Timur
User: PT Smelting
Project: Integrated Membrane System for Liquid Salt Production
Capacity: 40.000 ton/hour
Scope: Engineering, Procurement, and Construction
Integrated Membrane System for Saturated Brine (Pilot Plant)
Year: 2021
Location: Tangerang, Banten
User: PTSEIK, BPPT
Project: Integrated Membrane System for Saturated Brine (Pilot Plant)
Capacity: 50 liter/hour
Scope: Engineering, Procurement, and Construction
Project
Year:
Location:
User:
Project:
Capacity:
Scope: Engineering, Procurement, and Construction
Project
Year:
Location:
User:
Project:
Capacity:
Scope: Engineering, Procurement, and Construction